$1.5-Billion Gerold Desmond Bridge Replacement Rises on Port of Long Beach
The cable-stayed bridge is scheduled to open by the end of 2019.
High above the Port of Long Beach, two tower cranes are busy assembling the new Gerold Desmond Bridge.
Source: Urbanize LA